Shift pattern guide
Pitman Shift Schedule: Fixed and Rotating 2-2-3 Variations
Understand the Pitman 2-2-3 schedule, its 14-day calendar, fixed and rotating versions, 12-hour totals, long weekends, and practical trade-offs.
The Pitman schedule is best understood as a 2-2-3 calendar plus a day/night assignment. The work-and-rest sequence is:
2 work → 2 off → 3 work → 2 off → 2 work → 3 off
That sequence is also covered in the general 2-2-3 shift schedule guide. This page focuses on the detail the Pitman name often leaves unclear: whether your crew is fixed or rotating.
A 14-day Pitman calendar
This example begins on Monday and labels shifts only as “Work.” Replace that label with your actual day or night shift.
| Week | Mon | Tue | Wed | Thu | Fri | Sat | Sun |
|---|---|---|---|---|---|---|---|
| 1 | Work | Work | Off | Off | Work | Work | Work |
| 2 | Off | Off | Work | Work | Off | Off | Off |
The first weekend is worked; the next weekend is free. After day 14, the same weekday alignment repeats.
Fixed versus rotating Pitman schedules
Fixed Pitman
One crew remains on day shifts and another remains on nights while following the same work/off pattern from different starting positions. Your calendar needs one shift type plus the 14-day sequence.
Rotating Pitman
A crew changes between days and nights after a longer interval defined by the employer. The work/off rhythm can still repeat every 14 days, while the full day/night assignment may take 28 days—or much longer—to return to its starting point.
Do not assume the switch happens every two weeks. Ask for the complete roster and identify the exact date when your shift type changes.
Working hours
Seven 12-hour shifts produce 84 scheduled hours in 14 days, averaging 42 hours per seven days. In a Monday-to-Sunday view, the example contains a 60-hour week followed by a 24-hour week.
That uneven display is normal for the pattern. It does not by itself determine overtime, paid breaks, or payroll calculations.
Advantages and disadvantages
Possible advantages
- Work stretches are limited to two or three days.
- The three-day weekend off returns every second week when properly aligned.
- A 14-day base sequence is predictable far in advance.
- Twelve-hour shifts reduce the number of commute days.
Possible disadvantages
- The three-shift working weekend can be demanding.
- Rotating versions add sleep transitions on top of 12-hour shifts.
- Calendar-week hours are uneven.
- The schedule name may hide employer-specific day/night changes.
Where Pitman schedules are used
Pitman-style four-crew coverage is associated with operations that run continuously, including emergency services, healthcare, manufacturing, utilities, and security. The exact local implementation matters more than the industry label.
Calendar setup checklist
Confirm your cycle’s first work day, your crew, the true start and end times, and whether you are on fixed or rotating shifts. Enter an overnight shift as one event spanning two dates. Keep leave, training, swaps, and overtime as exceptions to the base pattern.
If your employer calls the same roster a Panama schedule, read the Panama schedule guide for the four-crew coverage view and naming differences.
Long shifts need a separate safety assessment
The CCOHS rotational-shiftwork guidance explains that workload, shift length, recovery, and rotation direction all affect a schedule’s impact. This calendar example explains the pattern; it is not occupational-health advice.
Common questions
Pitman schedule FAQ
Is the Pitman schedule the same as 2-2-3?
Usually, yes. Pitman commonly names the same 14-day 2-2-3 work-and-rest sequence. The useful distinction is whether the employer keeps crews on fixed days or nights or rotates them between shift types.
How many hours do you work on a Pitman schedule?
The common 12-hour version contains seven shifts in 14 days, totaling 84 scheduled hours and averaging 42 hours per seven days. Payroll-week totals alternate and overtime treatment varies.
Does a Pitman schedule give every other weekend off?
With the standard pattern aligned Monday to Sunday, a three-day working weekend is followed by a three-day weekend off. A different cycle start date changes which named weekdays form that long break.