2-2-3 Shift Schedule: How the Pattern Works
See a clear 14-day 2-2-3 shift schedule example, understand the work-and-rest pattern, and learn what to confirm before adding it to your calendar.
The numbers describe blocks of work days and days off. Read from the start of the cycle, the sequence is:
2 work → 2 off → 3 work → 2 off → 2 work → 3 off
That creates a two-week rhythm with seven work days and seven days off. If each shift lasts 12 hours, it totals 84 scheduled hours across the two weeks before overtime or local workplace rules are considered.
A 14-day 2-2-3 example
This example starts on a Monday. “Work” only means scheduled to work; it does not decide whether the shift is a day or night shift.
| Day | Mon | Tue | Wed | Thu | Fri | Sat | Sun |
|---|---|---|---|---|---|---|---|
| Week 1 | Work | Work | Off | Off | Work | Work | Work |
| Week 2 | Off | Off | Work | Work | Off | Off | Off |
After Sunday of week two, the sequence begins again. Because the pattern covers exactly 14 days, the same work/off positions return on the same weekdays.
Why the pattern can still feel confusing
The work-and-rest rhythm is simple once it is visible, but an employer may add another layer by rotating crews between days and nights. That longer rotation is why some workplaces describe the complete roster as a 28-day cycle even though your on/off sequence repeats after 14 days.
Names are not perfectly consistent either. You may hear 2-2-3, Panama schedule, or Pitman schedule used for closely related rosters. Treat the name as a starting point, then copy the actual sequence, start date, shift times, and day/night changes from your employer’s roster.
What to confirm before putting it in a calendar
- The first day of your cycle. Starting from the wrong “work 2” block shifts every future date.
- Your shift times. Record the real start and end times, including overnight shifts that finish the next morning.
- When days and nights change. Do not assume the rotation changes every two weeks unless your roster says so.
- Your crew or team. Different teams can follow the same pattern at different points in the cycle.
- Exceptions. Training, overtime, leave, swaps, and holidays may override the base rotation.
A practical way to track it on iPhone
Instead of entering every shift separately, create the day or night shift types you actually work, arrange the 14-day sequence once, and let the calendar repeat it forward. Keep one-off changes separate from the underlying rotation so a single swap does not rebuild the entire schedule.
A note about long and rotating shifts
A calendar can make a roster easier to understand, but it cannot decide whether a schedule is safe for a particular workplace or person. The Canadian Centre for Occupational Health and Safety explains that shift length, rotation direction, rest, workload, and individual circumstances all matter. The UK Health and Safety Executive also recommends assessing long shifts and allowing adequate recovery. Follow your employer’s confirmed roster and applicable workplace guidance.
Common questions
2-2-3 schedule FAQ
Does a 2-2-3 schedule repeat every 14 or 28 days?
The personal work-and-rest sequence repeats every 14 days. A workplace may use a 28-day roster to rotate crews between day and night shifts, so always check the complete schedule supplied by your employer.
Do you get every other weekend off on a 2-2-3 schedule?
In the standard 14-day pattern, the three-day working weekend in one week is followed by a three-day weekend off in the next. Your exact weekend days depend on the roster's start day.
Is a 2-2-3 schedule always made of 12-hour shifts?
Twelve-hour shifts are common because two crews can cover each 24-hour day, but the name describes the on-and-off sequence rather than guaranteeing a particular start time or shift length. Confirm those details with your employer.